Insights, technical note, 4 min read, 2026-10-17

Steel route intensity and what it means for an iron metallics project

Per tonne of crude steel, the blast furnace route emits more than three times the CO₂ of scrap-based electric arc furnaces. Direct reduced iron sits between them.

Title
Steel route intensity and what it means for an iron metallics project
Doc no.
TN-605
Rev
P1
Discipline
CB EA
Date
2026-10-17
Status
Published
What this means for you

If you make or buy steel, the production route sets most of its carbon. Plant-specific data is worth having before EU buyers start passing on costs.

Scrap-based EAF steel carries under a third of the blast-furnace route's CO₂ per tonne.

t CO₂ per t crude steel cast, 2024 data.

CO2 intensity of steel by production route, 2024Horizontal bars: BF-BOF 2.34, DRI-EAF 1.47, scrap-EAF 0.69 tonnes CO2 per tonne of crude steel; world average 1.92.00.511.522.5BF-BOF2.34DRI-EAF1.47Scrap-EAF0.69World average 1.92t CO₂ per t crude steel
Data table
Routet CO₂/t
2.34
1.47
Scrap-EAF0.69
World average1.92
CO₂ intensity by steel production route.Source: worldsteel, Sustainability Indicators 2025, p. 5.

worldsteel's 2025 indicators put the 2024 global average at 1.92 t CO₂ per tonne of crude steel cast: 2.34 for the blast furnace and basic oxygen furnace route, 1.47 for DRI with an electric arc furnace, and 0.69 for scrap-based EAF. On a broader greenhouse-gas basis that adds methane, nitrous oxide and upstream mining, the figures are 2.66, 1.66 and 0.71, with a global average of 2.18. worldsteel puts the industry at 7 to 8 percent of global anthropogenic greenhouse gas emissions.1

For the project assessment

The DRI figure is not split by reductant, so a gas-based plant designed for later hydrogen blending should not borrow it as its own . Build the project's intensity bottom-up from the design energy and material balance, state the boundary (with or without pelletising and mining), and use the route averages only as context.

For exporters, the same calculation now has a commercial use. Iron and steel are CBAM goods, and an installation-level figure built from real data is often lower than the marked-up EU default value, though not always, so calculate it before deciding which to declare.

Capture is still small

Operating capture capacity is about an eighth of what is operating or in development.

Mt CO₂ per year, July 2025.

Global CCS capture capacity, operating and in developmentProportional bar: 64 Mt CO2 per year operating out of 513 Mt per year operating and in development.64 operating513 operating and in development0100200300400500Mt CO₂ per year, July 2025
Global CCS capture capacity, operating and in development.Source: Global CCS Institute, Global Status of CCS 2025. The 2026 edition is due on 20 October 2026.

For context on capture as a decarbonisation route, the Global CCS Institute counted 64 Mt a year of capture capacity in operation at 77 facilities in July 2025, against 513 Mt a year operating and in development.2

Notes and references

  1. World Steel Association (2025). Sustainability Indicators 2025 (2024 data), pp. 5–6 and 10. https://worldsteel.org/wp-content/uploads/Sustainability-Indicators-2025.pdf Back to text
  2. Global CCS Institute (2025). Global Status of CCS 2025, executive summary and press release, 9 October 2025. https://www.globalccsinstitute.com/wp-content/uploads/2025/10/GSR-2025-Executive-Summary-21-October.pdf Back to text

Send your production route and last year's energy and material balance. We reply with what a credible intensity figure needs.