SV-100 to SV-400
Services
Environmental and social impact assessment with the specialist models behind it, carbon accounting from to product , the data systems that keep both reproducible, and the monitoring instruments that feed them. We take a study end to end, deliver one component of a larger , or review someone else's work before a lender does.
SV-100
Impact assessment (EIA and ESIA) and modelling
Environmental impact assessments (EIA and ESIA) and specialist studies for energy, heavy industry, infrastructure and carbon storage projects, written to and the .
What this means for you. If you are building a plant, pipeline, port or district that needs a loan or a permit, this is the study that shows what it will do to the air, water, noise and people nearby, and how you will manage it.
- Scope
- Scoping and terms of reference
Baseline design, supervision and QA
Air dispersion, noise and vibration
Hydrology, flood risk, hydrodynamics
Underwater noise
Mitigation sizing and management plans - What we need from you
- Project description and layout
Emission and discharge inventory
Existing monitoring data
Target standard and lender list - What you receive
- ESIA chapters or standalone reports
Model input and output files
Assumptions register
IFC Performance Standards gap table - Standards
- IFC Performance Standards 1–8
IFC EHS General and sector guidelines
Equator Principles 4
WHO AQG 2021, national limits
Receptor results, as we tabulate them
| Receptor | Predicted | Background | Total | Criterion | % of criterion | Status |
|---|---|---|---|---|---|---|
| R-1 | 4.2 | 31.0 | 35.2 | 45 | 78% | ✓ Within |
| R-2 | 6.8 | 33.0 | 39.8 | 45 | 88% | ◐ Close |
| R-3 | 11.5 | 38.0 | 49.5 | 45 | 110% | Δ Exceeds |
| R-4 | 1.9 | 29.0 | 30.9 | 45 | 69% | ✓ Within |
SV-200
Carbon and life-cycle accounting
Embedded emissions for CBAM goods, organisational inventories and product footprints that a verifier, auditor or customer can trace line by line.
What this means for you. If you export to the EU or sell to large companies, buyers now ask how much carbon went into what you make. We measure it and put it in the form they need.
CBAM in detail · Carbon accounting and LCA in detail
We are not a CBAM verifier. Verification is carried out by a verifier accredited by an EU national accreditation body; we prepare what the verifier checks.
- Scope
- CBAM embedded emissions per installation and good
Monitoring methodology and data for verification
Scope 1–3 inventories and boundaries
Product LCA and packaging
Supplier data programmes
Abatement ranked by cost and certainty - What we need from you
- Production and energy records by installation
Bills of materials and process data
Supplier and EU importer contacts
Prior inventories and targets - What you receive
- CBAM emissions report and data template for your EU importer
Inventory workbook with factor sources
LCA model files and report
Data-quality and uncertainty statement - Standards
- EU CBAM Regulation 2023/956 and implementing rules
GHG Protocol Corporate and Scope 3
ISO 14040/44, ISO 14067
ESRS E1, CDP
SV-300
Data systems and tools
Automation for environmental teams that spend too much time copying numbers between files.
What this means for you. Software that takes the spreadsheets and logger files your team already has and turns them into checked results.
- Scope
- Monitoring data pipelines and QA rules
Activity-data and emission-factor pipelines
Permit obligation tracking
Reporting dashboards
Custom tools built on our own software - What we need from you
- Sample files and the current workflow
Who reviews and who signs
Hosting and data-residency constraints - What you receive
- Working tool with documentation
Tests on your sample data
Plain-language runbook - Standards
- Your QA procedures
Encryption at rest, no training on client data
SV-400
Monitoring instruments
Instruments specified to the parameters and method the regulator requires and the conditions on site, configured, and shipped to project sites worldwide, then connected to the pipeline that checks and reports their data.
What this means for you. The equipment that measures air, noise, weather and water on site, chosen to meet the rules you are judged by and shipped wherever you need it.
| Station | Typical parameters | Typical duration |
|---|---|---|
| Ambient air quality | PM10, PM2.5, NO2, SO2, CO, O3, with meteorology | Baseline campaign or continuous |
| Noise and vibration | LAeq, LA90, LAmax, ⅓-octave spectra, peak particle velocity | Weeks to months |
| Meteorological | Wind speed and direction, temperature, humidity, pressure, solar radiation, rainfall | One year or more for modelling |
| Water quality | pH, dissolved oxygen, turbidity, conductivity, temperature, flow | Continuous or campaign |
| Stack and process | Flue gas concentrations, flow and temperature | Permanent installation |
- Scope
- Instrument specification against the required method
Supply, configuration and pre-shipment testing, shipped worldwide subject to export and import rules
Enclosures, power and telemetry for remote or hot sites
Installation, commissioning and calibration
Data logging into our QA pipeline and dashboards - What we need from you
- Parameters and averaging periods
The standard or regulator method
Site conditions: power, heat, dust, access
Campaign length or permanent duty - What you receive
- Specification and method compliance statement
Configured, tested equipment
Calibration certificates and maintenance plan
Validated data, not raw files - Standards
- Reference or equivalent methods set by the regulator
Type 1 or 2 sound level meters to IEC standards, as IFC EHS requires
Traceable calibration
SV-910
What we model, and what it is compared against
| Domain | Methods | Outputs | Compared against |
|---|---|---|---|
| Air quality | , CALPUFF, Gaussian screening | 1-hour, 24-hour and annual contours, cumulative with background | WHO global air quality guidelines (2021), IFC EHS General Guidelines, national standards |
| Noise and vibration | ISO 9613-2 propagation, construction and operational scenarios | Day and night LAeq contours, tables, barrier sizing | IFC EHS General Guidelines (2007) Table 1.7.1, national limits |
| Hydrology and flood | Rainfall–runoff and 1D/2D hydraulic models | Flood extents, design flows, drainage sizing | Return-period design criteria, local codes |
| Hydrodynamics | 2D and 3D and models | Thermal and brine plume extents, mixing-zone checks | IFC EHS guidelines, national discharge limits |
| Underwater noise | Propagation modelling for piling, dredging and vessels | Injury and ranges by hearing group | NOAA Fisheries technical guidance v3.0 (2024) |
| Carbon and LCA | openLCA, SimaPro, GaBi, GREET, Python | CBAM embedded emissions, footprints, hotspots, scenarios | EU CBAM rules, GHG Protocol, ISO 14040/44, ISO 14067 |
SV-920
Standards we work to
- IFC Performance Standards 1–8 (2012)
- Lender-financed projects
- IFC EHS General Guidelines (2007)
- Air emissions, noise, effluent
- Equator Principles 4 (2020)
- Projects financed by the 126 signatory institutions (June 2026)
- WHO global air quality guidelines (2021)
- Ambient air benchmarks
- India NAAQS (2009)
- Ambient air, India
- US EPA 40 CFR 51 Appendix W
- Model selection and met data requirements
- ISO 9613-2
- Outdoor sound propagation
- NOAA Fisheries acoustic guidance v3.0 (2024)
- Marine mammal injury and TTS onset
- EU CBAM Regulation 2023/956, as amended
- Embedded emissions of goods imported to the EU
- GHG Protocol Corporate and Scope 3
- Organisational inventories
- ISO 14040/14044, ISO 14067
- LCA and product carbon footprints
- ESRS E1
- Climate disclosure under CSRD
SV-900
Engagement formats
| Format | When it fits | Typical deliverable |
|---|---|---|
| Fixed-scope study | A defined deliverable with known inputs | A full ESIA, one modelling chapter, a CBAM emissions report or a product LCA |
| Independent review | Before a lender, verifier or regulator sees the work | Comment log split into critical gaps and direct fixes |
| Technical retainer | Several projects needing modelling, data or carbon support | Monthly allocation of specialist time |
Tell us about the project. We reply shortly with the questions a lender, regulator or verifier is likely to raise.